ys_opx_CBK1a@6 < 20190226101137-255804 > pub
  • technique: SIMS
  • device: SIMS Cameca ims-5f
  • operator: Shimaki
  • modified at 2019-02-26
  • stone: TS CBK1-a
  • references:
    • DREAM (2019) Summary of the Chelyabinsk project (Nakamura et al., 2019), DREAM Digital Document, 19, 20190326083025-844154. more
measured value uncertainty unit description
[Li] 4.18e-07 g/g
[Sr] 1.26e-06 g/g
[Y] 5.29e-07 g/g
[Zr] 9.22e-07 g/g
[Nb] 1.05e-07 g/g
[Ba] 5.14e-07 g/g
[La] 4.28e-08 g/g
[Ce] 9.34e-08 g/g
[Pr] 1.02e-08 g/g
[Nd] 5.57e-08 g/g
[Sm] 2.3e-08 g/g
[Eu] 1.01e-08 g/g
[Gd] 3.11e-08 g/g
[Dy] 8.76e-08 g/g
[Er] 5.15e-08 g/g
[Yb] 1.32e-07 g/g
[Lu] 2.99e-08 g/g
[Hf] 4.12e-08 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id