ys_opx_CBK1a@15 < 20190226101137-485906 > pub
  • technique: SIMS
  • device: SIMS Cameca ims-5f
  • operator: Shimaki
  • modified at 2019-02-26
  • stone: TS CBK1-a
  • references:
    • DREAM (2019) Summary of the Chelyabinsk project (Nakamura et al., 2019), DREAM Digital Document, 19, 20190326083025-844154. more
measured value uncertainty unit description
[Li] 1.41e-07 g/g
[Sr] 1.31e-06 g/g
[Y] 4.04e-07 g/g
[Zr] 1.54e-06 g/g
[Nb] 3.28e-07 g/g
[Ba] 2.35e-07 g/g
[La] 1.73e-08 g/g
[Ce] 4.25e-08 g/g
[Pr] 8.82e-09 g/g
[Nd] 1.89e-08 g/g
[Sm] 1.79e-08 g/g
[Eu] 1.09e-08 g/g
[Gd] 2.64e-08 g/g
[Dy] 5.95e-08 g/g
[Er] 4.07e-08 g/g
[Yb] 1.07e-07 g/g
[Lu] 2.81e-08 g/g
[Hf] 2.52e-08 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id