ys_opx_CBK1a@14 < 20190226101136-651726 > pub
  • technique: SIMS
  • device: SIMS Cameca ims-5f
  • operator: Shimaki
  • modified at 2019-02-26
  • stone: TS CBK1-a
  • references:
    • DREAM (2019) Summary of the Chelyabinsk project (Nakamura et al., 2019), DREAM Digital Document, 19, 20190326083025-844154. more
measured value uncertainty unit description
[Li] 1.3e-07 g/g
[Sr] 9.61e-07 g/g
[Y] 3.73e-07 g/g
[Zr] 1.15e-06 g/g
[Nb] 2.39e-07 g/g
[Ba] 9.86e-08 g/g
[La] 1.19e-08 g/g
[Ce] 1.9e-08 g/g
[Pr] 5.09e-09 g/g
[Nd] 2.6e-08 g/g
[Sm] 1.88e-08 g/g
[Eu] 8.76e-09 g/g
[Gd] 1.26e-08 g/g
[Dy] 2.18e-08 g/g
[Er] 3.63e-08 g/g
[Yb] 1.03e-07 g/g
[Lu] 3.3e-08 g/g
[Hf] 4.71e-08 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id