ys_dnd_CBK1a@24 < 20190226101136-938192 > pub
  • technique: SIMS
  • device: SIMS Cameca ims-5f
  • operator: Shimaki
  • modified at 2019-02-26
  • stone: TS CBK1-a
  • references:
    • DREAM (2019) Summary of the Chelyabinsk project (Nakamura et al., 2019), DREAM Digital Document, 19, 20190326083025-844154. more
measured value uncertainty unit description
[Li] 8.2e-07 g/g
[Sr] 7.52e-05 g/g
[Y] 4.75e-06 g/g
[Zr] 2.98e-05 g/g
[Nb] 1.08e-06 g/g
[Ba] 2.88e-05 g/g
[La] 3.88e-07 g/g
[Ce] 1.13e-06 g/g
[Pr] 1.58e-07 g/g
[Nd] 9.97e-07 g/g
[Sm] 3.29e-07 g/g
[Eu] 4.7e-07 g/g
[Gd] 4.65e-07 g/g
[Dy] 7.33e-07 g/g
[Er] 4.12e-07 g/g
[Yb] 5.68e-07 g/g
[Lu] 1.26e-07 g/g
[Hf] 7.4e-07 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id