ys_cpx_CBK1a@44 < 20190226101134-245160 > pub
  • technique: SIMS
  • device: SIMS Cameca ims-5f
  • operator: Shimaki
  • modified at 2019-02-26
  • stone: TS CBK1-a
  • references:
    • DREAM (2019) Summary of the Chelyabinsk project (Nakamura et al., 2019), DREAM Digital Document, 19, 20190326083025-844154. more
measured value uncertainty unit description
[Li] 5.41e-07 g/g
[Sr] 2.99e-05 g/g
[Y] 2.63e-06 g/g
[Zr] 2.12e-05 g/g
[Nb] 5.93e-07 g/g
[Ba] 1.02e-05 g/g
[La] 1.23e-07 g/g
[Ce] 3.11e-07 g/g
[Pr] 5.74e-08 g/g
[Nd] 3.33e-07 g/g
[Sm] 1.57e-07 g/g
[Eu] 1.83e-07 g/g
[Gd] 2.53e-07 g/g
[Dy] 4.19e-07 g/g
[Er] 2.63e-07 g/g
[Yb] 4.51e-07 g/g
[Lu] 5.62e-08 g/g
[Hf] 4.46e-07 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id