ys_ol_CBK1a@66 < 20190226101133-117216 > pub
  • technique: SIMS
  • device: SIMS Cameca ims-5f
  • operator: Shimaki
  • modified at 2019-02-26
  • stone: TS CBK1-a
  • references:
    • DREAM (2019) Summary of the Chelyabinsk project (Nakamura et al., 2019), DREAM Digital Document, 19, 20190326083025-844154. more
measured value uncertainty unit description
[Li] 1.43e-06 g/g
[Sr] 4.83e-06 g/g
[Y] 1.05e-06 g/g
[Zr] 2.41e-06 g/g
[Nb] 2.89e-07 g/g
[Ba] 1.97e-06 g/g
[La] 1.37e-07 g/g
[Ce] 4.25e-07 g/g
[Pr] 5.56e-08 g/g
[Nd] 3.32e-07 g/g
[Sm] 8.48e-08 g/g
[Eu] 4.37e-08 g/g
[Gd] 1.38e-07 g/g
[Dy] 2.01e-07 g/g
[Er] 1.02e-07 g/g
[Yb] 1.3e-07 g/g
[Lu] 3.08e-08 g/g
[Hf] 1.6e-08 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id