ys_ol_CBK1a@65 < 20190226101133-450585 > pub
  • technique: SIMS
  • device: SIMS Cameca ims-5f
  • operator: Shimaki
  • modified at 2019-02-26
  • stone: TS CBK1-a
  • references:
    • DREAM (2019) Summary of the Chelyabinsk project (Nakamura et al., 2019), DREAM Digital Document, 19, 20190326083025-844154. more
measured value uncertainty unit description
[Li] 1.06e-06 g/g
[Sr] 4.9e-07 g/g
[Y] 7.45e-08 g/g
[Zr] 4.28e-07 g/g
[Nb] 1.08e-07 g/g
[Ba] 2.41e-07 g/g
[La] 1.09e-08 g/g
[Ce] 2.26e-08 g/g
[Pr] 9.57e-09 g/g
[Nd] 3.7e-08 g/g
[Sm] 4.0e-08 g/g
[Eu] 5.78e-08 g/g
[Gd] 2.04e-08 g/g
[Dy] 2.71e-08 g/g
[Er] 4.06e-08 g/g
[Yb] 3.58e-08 g/g
[Lu] 4.03e-08 g/g
[Hf] 7.02e-08 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id