ys_ol_CBK1a@55 < 20190226101132-569448 > pub
  • technique: SIMS
  • device: SIMS Cameca ims-5f
  • operator: Shimaki
  • modified at 2019-02-26
  • stone: TS CBK1-a
  • references:
    • DREAM (2019) Summary of the Chelyabinsk project (Nakamura et al., 2019), DREAM Digital Document, 19, 20190326083025-844154. more
measured value uncertainty unit description
[Li] 1.07e-06 g/g
[Sr] 2.44e-06 g/g
[Y] 6.15e-08 g/g
[Zr] 8.0e-07 g/g
[Nb] 1.76e-07 g/g
[Ba] 1.06e-06 g/g
[La] 1.76e-08 g/g
[Ce] 3.26e-08 g/g
[Pr] 7.34e-09 g/g
[Nd] 2.08e-08 g/g
[Sm] 2.4e-08 g/g
[Eu] 1.96e-08 g/g
[Gd] 2.44e-08 g/g
[Dy] 2.4e-08 g/g
[Er] 2.35e-08 g/g
[Yb] 3.06e-08 g/g
[Lu] 1.48e-08 g/g
[Hf] 3.82e-08 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id