ys_ol_CBK1a@54 < 20190226101132-678436 > pub
  • technique: SIMS
  • device: SIMS Cameca ims-5f
  • operator: Shimaki
  • modified at 2019-02-26
  • stone: TS CBK1-a
  • references:
    • DREAM (2019) Summary of the Chelyabinsk project (Nakamura et al., 2019), DREAM Digital Document, 19, 20190326083025-844154. more
measured value uncertainty unit description
[Li] 1.55e-06 g/g
[Sr] 1.75e-06 g/g
[Y] 1.13e-07 g/g
[Zr] 5.4e-07 g/g
[Nb] 2.28e-07 g/g
[Ba] 8.26e-07 g/g
[La] 1.12e-08 g/g
[Ce] 3.58e-08 g/g
[Pr] 6.9e-09 g/g
[Nd] 2.45e-08 g/g
[Sm] 2.26e-08 g/g
[Eu] 9.56e-09 g/g
[Gd] 9.18e-09 g/g
[Dy] 2.13e-08 g/g
[Er] 3.28e-08 g/g
[Yb] 3.6e-08 g/g
[Lu] 1.33e-08 g/g
[Hf] 3.12e-08 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id