ys_ol_CBK1a@53 < 20190226101131-863196 > pub
  • technique: SIMS
  • device: SIMS Cameca ims-5f
  • operator: Shimaki
  • modified at 2019-02-26
  • stone: TS CBK1-a
  • references:
    • DREAM (2019) Summary of the Chelyabinsk project (Nakamura et al., 2019), DREAM Digital Document, 19, 20190326083025-844154. more
measured value uncertainty unit description
[Li] 2.23e-06 g/g
[Sr] 3.21e-06 g/g
[Y] 1.78e-06 g/g
[Zr] 9.98e-07 g/g
[Nb] 2.54e-07 g/g
[Ba] 5.47e-07 g/g
[La] 1.88e-07 g/g
[Ce] 5.61e-07 g/g
[Pr] 6.63e-08 g/g
[Nd] 4.91e-07 g/g
[Sm] 2.17e-07 g/g
[Eu] 1.75e-08 g/g
[Gd] 3.05e-07 g/g
[Dy] 3.51e-07 g/g
[Er] 1.75e-07 g/g
[Yb] 2.66e-07 g/g
[Lu] 7.45e-08 g/g
[Hf] 2.78e-08 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id