ys_ol_CBK1a@52 < 20190226101131-138992 > pub
  • technique: SIMS
  • device: SIMS Cameca ims-5f
  • operator: Shimaki
  • modified at 2019-02-26
  • stone: TS CBK1-a
  • references:
    • DREAM (2019) Summary of the Chelyabinsk project (Nakamura et al., 2019), DREAM Digital Document, 19, 20190326083025-844154. more
measured value uncertainty unit description
[Li] 1.03e-06 g/g
[Sr] 8.21e-07 g/g
[Y] 4.14e-07 g/g
[Zr] 7.52e-07 g/g
[Nb] 1.72e-07 g/g
[Ba] 3.92e-07 g/g
[La] 4.07e-08 g/g
[Ce] 1.08e-07 g/g
[Pr] 1.81e-08 g/g
[Nd] 1.06e-07 g/g
[Sm] 5.55e-08 g/g
[Eu] 7.44e-09 g/g
[Gd] 3.74e-08 g/g
[Dy] 4.03e-08 g/g
[Er] 5.24e-08 g/g
[Yb] 6.64e-08 g/g
[Lu] 2.49e-08 g/g
[Hf] 7.64e-08 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id