misip_pl_ok4na@17 < 20190222121816-762599 > pub
  • technique: SIMS
  • operator: misip
  • modified at 2019-02-22
  • stone: TS OK4n-a
  • references:
    • DREAM (2019) Summary of the Chelyabinsk project (Nakamura et al., 2019), DREAM Digital Document, 19, 20190326083025-844154. more
measured value uncertainty unit description
[Li] 9.19e-07 g/g
[Sr] 1.1e-06 g/g
[Y] 5.73e-08 g/g
[Zr] 4.69e-06 g/g
[Nb] 2.35e-06 g/g
[Ba] 4.26e-05 g/g
[La] 1.03e-07 g/g
[Ce] 1.17e-07 g/g
[Pr] 1.26e-08 g/g
[Nd] 2.12e-08 g/g
[Sm] 3.29e-08 g/g
[Eu] 7.24e-07 g/g
[Gd] 1.69e-08 g/g
[Dy] 2.0e-08 g/g
[Er] 6.03e-08 g/g
[Yb] 1.56e-08 g/g
[Lu] 1.39e-08 g/g
[Hf] 1.12e-07 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id