misip_ol_ok4na@12 < 20190222121814-296883 > pub
  • technique: SIMS
  • operator: misip
  • modified at 2019-02-22
  • stone: TS OK4n-a
  • references:
    • DREAM (2019) Summary of the Chelyabinsk project (Nakamura et al., 2019), DREAM Digital Document, 19, 20190326083025-844154. more
measured value uncertainty unit description
[Li] 2.55e-07 g/g
[Sr] 1.18e-07 g/g
[Y] 3.81e-08 g/g
[Zr] 5.76e-07 g/g
[Nb] 4.4e-07 g/g
[Ba] 1.04e-07 g/g
[La] 6.61e-09 g/g
[Ce] 1.64e-08 g/g
[Pr] 3.39e-09 g/g
[Nd] 2.07e-08 g/g
[Sm] 2.39e-08 g/g
[Eu] 6.68e-09 g/g
[Gd] 1.38e-08 g/g
[Yb] 1.41e-07 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id