misip_ol_ok4na@8 < 20190222121812-014281 > pub
  • technique: SIMS
  • operator: misip
  • modified at 2019-02-22
  • stone: TS OK4n-a
  • references:
    • DREAM (2019) Summary of the Chelyabinsk project (Nakamura et al., 2019), DREAM Digital Document, 19, 20190326083025-844154. more
measured value uncertainty unit description
[Li] 3.29e-06 g/g
[Sr] 1.56e-07 g/g
[Y] 2.21e-08 g/g
[Zr] 5.98e-08 g/g
[Nb] 2.37e-08 g/g
[Ba] 8.29e-08 g/g
[La] 5.8e-09 g/g
[Ce] 6.79e-09 g/g
[Pr] 3.4e-09 g/g
[Nd] 2.08e-08 g/g
[Sm] 2.39e-08 g/g
[Eu] 5.74e-09 g/g
[Gd] 1.15e-08 g/g
[Yb] 2.39e-08 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id