misip_ol_ok4na@7 < 20190222121811-649730 > pub
  • technique: SIMS
  • operator: misip
  • modified at 2019-02-22
  • stone: TS OK4n-a
  • references:
    • DREAM (2019) Summary of the Chelyabinsk project (Nakamura et al., 2019), DREAM Digital Document, 19, 20190326083025-844154. more
measured value uncertainty unit description
[Li] 9.48e-07 g/g
[Sr] 1.42e-07 g/g
[Y] 4.71e-08 g/g
[Zr] 3.83e-07 g/g
[Nb] 5.49e-08 g/g
[Ba] 1.26e-07 g/g
[La] 8.72e-09 g/g
[Ce] 2.61e-08 g/g
[Pr] 4.65e-09 g/g
[Nd] 3.12e-08 g/g
[Sm] 2.57e-08 g/g
[Eu] 5.81e-09 g/g
[Gd] 3.03e-08 g/g
[Dy] 3.65e-08 g/g
[Yb] 3.2e-08 g/g
[Lu] 9.81e-09 g/g
[Hf] 1.55e-07 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id