measured value uncertainty unit description
[Li] 3.2e-07 g/g
[Sr] 0.000124 g/g
[Y] 1.88e-05 g/g
[Zr] 1.57e-06 g/g
[Nb] 1.38e-06 g/g
[Ba] 1.4e-06 g/g
[La] 1.59e-05 g/g
[Ce] 3.06e-05 g/g
[Pr] 3.53e-06 g/g
[Nd] 1.58e-05 g/g
[Sm] 4.05e-06 g/g
[Eu] 1.11e-06 g/g
[Gd] 4.57e-06 g/g
[Dy] 4.1e-06 g/g
[Er] 2.25e-06 g/g
[Yb] 1.73e-06 g/g
[Lu] 2.0e-07 g/g
[Hf] 1.01e-07 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id