misip_ap_ok4na@2 < 20190222121810-964262 > pub
  • technique: SIMS
  • operator: misip
  • modified at 2019-02-22
  • stone: TS OK4n-a
  • references:
    • DREAM (2019) Summary of the Chelyabinsk project (Nakamura et al., 2019), DREAM Digital Document, 19, 20190326083025-844154. more
measured value uncertainty unit description
[Li] 7.28e-07 g/g
[Sr] 0.000118 g/g
[Y] 1.9e-05 g/g
[Zr] 1.35e-06 g/g
[Nb] 2.09e-07 g/g
[Ba] 2.3e-06 g/g
[La] 1.62e-05 g/g
[Ce] 3.06e-05 g/g
[Pr] 3.58e-06 g/g
[Nd] 1.66e-05 g/g
[Sm] 4.03e-06 g/g
[Eu] 1.0e-06 g/g
[Gd] 4.14e-06 g/g
[Dy] 3.98e-06 g/g
[Er] 2.04e-06 g/g
[Yb] 1.81e-06 g/g
[Lu] 2.83e-07 g/g
[Hf] 6.86e-08 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id